notion-spec-to-implementation
将Notion中的规范转化为关联的实施计划、任务和持续状态更新,加速项目落地。
npx skills add openai/skills --skill notion-spec-to-implementationBefore / After 效果对比
1 组之前,产品经理在 Notion 中完成需求规格说明书后,需要手动创建项目计划、拆分任务,并在不同的工具或页面中维护这些任务的链接和状态。这过程繁琐,容易出错,且难以保持所有相关文档的同步。
使用此技能后,可以直接将 Notion 规格书转化为结构化的实施计划和任务列表,并自动建立链接。所有任务的进展和状态更新都能实时反映,确保产品、开发和测试团队之间的信息高度同步,大幅提升了从需求到落地的效率和透明度。
notion-spec-to-implementation
Spec to Implementation
Convert a Notion spec into linked implementation plans, tasks, and ongoing status updates.
Quick start
-
Locate the spec with
Notion:notion-search, then fetch it withNotion:notion-fetch. -
Parse requirements and ambiguities using
reference/spec-parsing.md. -
Create a plan page with
Notion:notion-create-pages(pick a template: quick vs. full). -
Find the task database, confirm schema, then create tasks with
Notion:notion-create-pages. -
Link spec ↔ plan ↔ tasks; keep status current with
Notion:notion-update-page.
Workflow
0) If any MCP call fails because Notion MCP is not connected, pause and set it up:
- Add the Notion MCP:
codex mcp add notion --url https://mcp.notion.com/mcp
- Enable remote MCP client:
Set [features].rmcp_client = true in config.toml or run codex --enable rmcp_client
- Log in with OAuth:
codex mcp login notion
After successful login, the user will have to restart codex. You should finish your answer and tell them so when they try again they can continue with Step 1.
1) Locate and read the spec
-
Search first (
Notion:notion-search); if multiple hits, ask the user which to use. -
Fetch the page (
Notion:notion-fetch) and scan for requirements, acceptance criteria, constraints, and priorities. Seereference/spec-parsing.mdfor extraction patterns. -
Capture gaps/assumptions in a clarifications block before proceeding.
2) Choose plan depth
-
Simple change → use
reference/quick-implementation-plan.md. -
Multi-phase feature/migration → use
reference/standard-implementation-plan.md. -
Create the plan via
Notion:notion-create-pages, include: overview, linked spec, requirements summary, phases, dependencies/risks, and success criteria. Link back to the spec.
3) Create tasks
-
Find the task database (
Notion:notion-search→Notion:notion-fetchto confirm the data source and required properties). Patterns inreference/task-creation.md. -
Size tasks to 1–2 days. Use
reference/task-creation-template.mdfor content (context, objective, acceptance criteria, dependencies, resources). -
Set properties: title/action verb, status, priority, relations to spec + plan, due date/story points/assignee if provided.
-
Create pages with
Notion:notion-create-pagesusing the database’sdata_source_id.
4) Link artifacts
-
Plan links to spec; tasks link to both plan and spec.
-
Optionally update the spec with a short “Implementation” section pointing to the plan and tasks using
Notion:notion-update-page.
5) Track progress
-
Use the cadence in
reference/progress-tracking.md. -
Post updates with
reference/progress-update-template.md; close phases withreference/milestone-summary-template.md. -
Keep checklists and status fields in plan/tasks in sync; note blockers and decisions.
References and examples
-
reference/— parsing patterns, plan/task templates, progress cadence (e.g.,spec-parsing.md,standard-implementation-plan.md,task-creation.md,progress-tracking.md). -
examples/— end-to-end walkthroughs (e.g.,ui-component.md,api-feature.md,database-migration.md).
Weekly Installs288Repositoryopenai/skillsGitHub Stars14.5KFirst SeenJan 20, 2026Security AuditsGen Agent Trust HubPassSocketPassSnykPassInstalled oncodex250opencode236gemini-cli226cursor214github-copilot211amp193
用户评价 (0)
发表评价
暂无评价
统计数据
用户评分
为此 Skill 评分