deploy-checklist
Deployment checklist to ensure the integrity and security of production releases. An AI Agent Skill to improve work efficiency and automation.
npx skills add anthropics/knowledge-work-plugins --skill deploy-checklistBefore / After Comparison
1 组Manually completing the deployment checklist and ensuring production environment release tasks involves repeatedly consulting documentation and debugging. The entire process takes approximately 46 minutes.
Using this Skill for automated processing, tasks are completed within 7 minutes, with standardized processes and high accuracy.
deploy-checklist
/deploy-checklist
If you see unfamiliar placeholders or need to check which tools are connected, see CONNECTORS.md.
Generate a pre-deployment checklist to verify readiness before shipping.
Usage
/deploy-checklist $ARGUMENTS
Output
## Deploy Checklist: [Service/Release]
**Date:** [Date] | **Deployer:** [Name]
### Pre-Deploy
- [ ] All tests passing in CI
- [ ] Code reviewed and approved
- [ ] No known critical bugs in release
- [ ] Database migrations tested (if applicable)
- [ ] Feature flags configured (if applicable)
- [ ] Rollback plan documented
- [ ] On-call team notified
### Deploy
- [ ] Deploy to staging and verify
- [ ] Run smoke tests
- [ ] Deploy to production (canary if available)
- [ ] Monitor error rates and latency for 15 min
- [ ] Verify key user flows
### Post-Deploy
- [ ] Confirm metrics are nominal
- [ ] Update release notes / changelog
- [ ] Notify stakeholders
- [ ] Close related tickets
### Rollback Triggers
- Error rate exceeds [X]%
- P50 latency exceeds [X]ms
- [Critical user flow] fails
Customization
Tell me about your deploy and I'll customize the checklist:
-
"We use feature flags" → adds flag verification steps
-
"This includes a database migration" → adds migration-specific checks
-
"This is a breaking API change" → adds consumer notification steps
If Connectors Available
If ~~source control is connected:
-
Pull the release diff and list of changes
-
Verify all PRs are approved and merged
If ~~CI/CD is connected:
-
Check build and test status automatically
-
Verify pipeline is green before deploy
If ~~monitoring is connected:
-
Pre-fill rollback trigger thresholds from current baselines
-
Set up post-deploy metric watch
Tips
-
Run before every deploy — Even routine ones. Checklists prevent "I forgot to..."
-
Customize once, reuse — Tell me your stack and I'll remember your deploy process.
-
Include rollback criteria — Decide when to roll back before you deploy, not during.
Weekly Installs295Repositoryanthropics/know…-pluginsGitHub Stars10.5KFirst SeenMar 13, 2026Security AuditsGen Agent Trust HubPassSocketPassSnykPassInstalled oncodex282gemini-cli280opencode279cursor279github-copilot278amp278
User Reviews (0)
Write a Review
No reviews yet
Statistics
User Rating
Rate this Skill